upload
George E King Consulting Inc.
Settore: Oil & gas
Number of terms: 9502
Number of blossaries: 0
Company Profile:
George King is a technology provider in the oil and gas industry specializing in new technology and problem oil well solutions.
Reserves subcategorized as non-producing include shut-in and behind-pipe reserves. Shut-in reserves are expected to be recovered from (1) completion intervals which are open at the time of the estimate, but which have not started producing, (2) wells which were shut-in for market conditions or pipeline connections, or (3) wells not capable of production for mechanical reasons..
Industry:Oil & gas
Reserves subcategorized as non-producing include shut-in and behind-pipe reserves. Shut-in reserves are expected to be recovered from (1) completion intervals which are open at the time of the estimate, but which have not started producing, (2) wells which were shut-in for market conditions or pipeline connections, or (3) wells not capable of production for mechanical reasons..
Industry:Oil & gas
Reserves subcategorized as non-producing include shut-in and behind-pipe reserves. Shut-in reserves are expected to be recovered from (1) completion intervals which are open at the time of the estimate, but which have not started producing, (2) wells which were shut-in for market conditions or pipeline connections, or (3) wells not capable of production for mechanical reasons. Behind-pipe reserves are expected to be recovered from zones in existing wells, which will require additional completion work or future re-completion prior to the start of production.
Industry:Oil & gas
Reserves subcategorized as producing are expected to be recovered from completion intervals which are open and producing at the time of the estimate. Improved recovery reserves are considered producing only after the improved recovery project is in operation..
Industry:Oil & gas
Reserves subcategorized as producing are expected to be recovered from completion intervals which are open and producing at the time of the estimate. Improved recovery reserves are considered producing only after the improved recovery project is in operation..
Industry:Oil & gas
Reservoirs that occur along ancient rivers where the rivers overflowed. Deposits are mostly silt and mud.
Industry:Oil & gas
Residue gas, as from a sulfur recovery unit.
Industry:Oil & gas
Resin formed by condensation of polybasic and monobasic acids with polyhydric alcohols.
Industry:Oil & gas
Resistance to rotation of a string. The turning force applied to the string to cause it to rotate.
Industry:Oil & gas
Rw
Resistivity of the formation water at the formation temperature.
Industry:Oil & gas