upload
U.S. Department of the Interior - Bureau of Reclamation
Settore: Government
Number of terms: 15655
Number of blossaries: 0
Company Profile:
A U.S. Department of the Interior agency that oversees water resource management incuding the oversight and operation of numerous diversion, delivery, and storage projects the agency has built throughout the western United States for irrigation, water supply, and attendant hydroelectric power ...
The full-load continuous rating of a generator, prime mover, or other electric power production equipment under specific conditions as designated by the manufacturer. Installed generator nameplate rating is usually indicated on a nameplate physically attached to the generator.
Industry:Engineering
Costs (usually long-term debt) of financing construction and equipment. Capital costs are usually fixed, one-time expenses which are independent of the amount of water produced. All the implements, equipment, machinery and inventory used in the production of goods and services.
Industry:Engineering
Cropland preparation by a special implement (chisel) that avoids complete inversion of the soil (as occurs with conventional moldboard plowing). Chisel plowing can leave a protective cover of crop residues on the soil surface that helps prevent erosion and improve infiltration.
Industry:Engineering
A rock fragment, usually rounded or semirounded, with an average dimension between 3 to 12 inches; will pass a 12-inch screen, but not a 3-inch screen. A particle of rock that will pass a 12-inch (300-mm) square opening and be retained on a 3-inch (75-mm) U.S.A. Standard sieve.
Industry:Engineering
A rock fragment, usually rounded or semirounded, with an average dimension between 3 to 12 inches; will pass a 12-inch screen, but not a 3-inch screen. A particle of rock that will pass a 12-inch (300-mm) square opening and be retained on a 3-inch (75-mm) U.S.A. Standard sieve.
Industry:Engineering
Removal of soluble material from soil or other permeable material by the passage of water through it. The removal of soluble soil material and colloids by percolating water. The process by which soluble substances are dissolved and transported down through the soil by recharge.
Industry:Engineering
The study of past or ancient floods which occurred prior to the time of human observation or direct measurement by modern hydrologic procedures. The study of the movements of water and sediment in channels before the time of continuous hydrologic records or direct measurements.
Industry:Engineering
Sloping accumulation of rock debris; also, rock fragments at the base of a cliff as the result of slides or falls. Rock fragments mixed with soil at the foot of a natural slope from which they have been separated. Accumulation of broken rocks or boulders at the base of a cliff.
Industry:Engineering
When the Froude number is equal to one, the flow is critical and surface waves remain stationary in the flow. Flow at critical depth. Used to describe open channel flow when certain relationships exist between specific energy and discharge, and between specific energy and depth.
Industry:Engineering
With reference to a wall or concrete dam, a coating of a different material, masonry or brick, for architectural or protection purposes, e.g., stonework facing, brickwork facing. With reference to an embankment dam, an impervious coating or face on the upstream slope of the dam.
Industry:Engineering